¹Ù·Î°¡±â



About us
E&P worldwide
Stockpiling Projects
Oil Stockpiling Projects
Construction Projects
Oil Information
Improvement of Petroleum Distribution Structure
Technology Development
New Energy
 
home > Operations > Stockpiling Projects > Construction Projects > Construction of production facilities
Construction of production facilities
 

Production facility formation

 

Component Function
Well Head Platform Structure to drill and produce hydrocarbons from gas reservoirs connected to gas fields on the seabed
PUQC Platform Structure loaded with equipment to separate fluids extracted from the reservoir into gas and condensate to suit specifications
Gas Export Pipeline Pipeline installed on the seabed to transport gas to processing facilities
FSO (Floating Storage & Offloading) Equipment to store condensate produced on the production platform and supply it to oil tankers

 

Summary of gas processing facilities process

 

  Function
Gas/liquid separation Separation of gas/liquid (condensate, water) from fluid produced in the reservoir
Dehydration Removal of water from separated gas
Dewpoint control Removal of heavy hydrocarbons from gas (C5¡è)
Gas pressurization Gas pressurization to transport gas via subsea pipelines
Condensate/water separation Separation of condensate and water
Condensate stabilization Maximum separation of gas components from condensate and stabilization process
FSO Storage and provision to tankers of stabilized condensate

 

Main processes

Department Contacts Updated
  Department : E&P Technology Center. Contacts : +82)52-216-3678

Footer Area