¹Ù·Î°¡±â



About us
ESG Management
Environment
Eco-friendly Management
New energy
- CCS Project
- Floating Offshore Wind Farm project
- Low-Carbon Hydrogen and Ammonia Project
Social
Governance
Ethical and Human Rights Business Management
 
home > Environment > New Energy > Floating Offshore Wind Farm project
Floating Offshore Wind Farm project
 

East Sea 1 Floating Offshore Wind Power Generation Project

What is the Donghae1 Floating Offshore Wind Farm project?

KNOC is launching a floating offshore wind farm project, utilizing the jacket structure of gas production platform, Donghae 1, which ceased its gas production by end of 2021. Donghae 1 is the first floating offshore wind farm project in Korea, reusing the existing gas production platform jacket as the substructure of this project enclosed by numbers of floating turbines, which will produce 780,000 MWh of electricity, enough for about 260,000 households annually.

Effect expected from Donghae1 Floating Offshore Wind Farm project

Reusing the existing platform jacket will reduce investment costs, and will also minimize marine pollution during decommissioning works. And this project will stimulate the industry related, expecting to create about 20,000 new employment during the construction period. With those positive effects, this project will fulfill Government¡¯s 'Renewable Energy 3020 Implementation Plan', and global trend of greenhouse gas reduction as well.

Status (Donghae1 floating offshore wind farm project)

Installing LIDAR system (Wind condition measuring instrument) in October 2018, KNOC has worked with Equinor and East-West Power, and passed the government preliminary feasibility study conducted by the Korea Development Institute in May 2021 and was granted a Electric Business License in Nov 2021, and is preparing the next stages, such as basic design, series of permits and etc, targetting commencement of commercial operation from 2026.

Business Outline
Business Outline
Kind Content
Project Donghae1 Floating offshore wind farm project
Capacity 200MW
Project site 5Km radius area around Donghae gas production platform, 58km east from Ulsan port
Project period [Construction] ¡¯21~¡¯25, [Operation] ¡¯26~¡¯45
[Floating Offshore Wind Farm projects view map]

[Business Outline]

Department Contacts Updated
Updated : 2022-10-28 Department : ESG Dept. Contacts : +82)52-216-5506

Footer Area